DEPLOYMENT
Live in 12 Weeks:
Warehouse Management System Deployment.
The gap is not project management. The heaviest lift in a WMS rollout is digitizing the building — and Spatialis OS does that with a tape measure in hours, not a CAD consultant and a multi-month digitization project.
Every deployment is phased flow-by-flow through UAT, so most facilities keep running at normal volume right up to go-live.
Timeline
Traditional WMS rollout9–18 months
Spatialis OS12 weeks
| Phase | Weeks |
|---|---|
| Discovery & Digital Twin Setup | WEEKS 1–2 |
| Configuration & Integration | WEEKS 3–5 |
| Phased UAT & Training | WEEKS 6–9 |
| Go-Live & Hypercare | WEEKS 10–12 |
| Spatialis OS | 12 weeks |
| Traditional WMS rollout | 9–18 months |
| Spatialis OS | + data cleansing, where needed |
Discovery & Digital Twin Setup
We map the facility and define workflows with your operations team, then build the live 3D model — every bin, shelf, rack, and aisle in true X, Y, Z space.
Configuration & Integration
Your ERP and eCommerce stack comes online — NetSuite, Dynamics 365, Shopify, WooCommerce, Magento, or a custom REST integration — and the AI slotting engine is configured against your SKU mix.
Phased UAT & Training
Each workflow — receiving, put-away, picking, kitting — is tested flow-by-flow against live data before it goes to the floor. Staff onboarding runs in parallel; most new hires reach full productivity in about two hours on the indoor-navigation interface.
Go-Live & Hypercare
Full production launch, backed by a 30-minute hypercare SLA while the floor stabilizes.
Warehouses don't fail from lack of effort. They fail from not knowing, in real time, where everything is.
FAQ
Questions about deployment.
01How long does a Spatialis OS deployment take?
12 weeks on average, not the 9–18 months typical of legacy WMS rollouts: discovery and digital twin setup (weeks 1–2), configuration and integration (weeks 3–5), phased UAT and training (weeks 6–9), and go-live with hypercare support (weeks 10–12).
02What support do we get after go-live?
Hypercare for the first two weeks, with under-30-minute acknowledgement during floor stabilization; standard business-hours ticketing (under 2 hours) after that; and a 24/7 emergency line with continuous engineering until restored for critical incidents.
03Do we need to pause operations during implementation?
No — deployment is phased flow-by-flow through UAT, so the floor keeps running at normal volume through configuration and testing, with the full cutover happening at go-live in weeks 10–12.
See the whole system: explore the full platform → or see how the Spatial Model is built →