INDUSTRIES / MANUFACTURING

Keep your lines fed.
Grow without a bigger building.

Production stops when a part can’t be found. Spatialis OS ties raw materials, work in progress and finished goods to a live 3D model of your plant, so planners and line leads look at the same picture.

Z.01 / THE PROBLEM

What keeps you up at night.

Line stoppages

A missing part at the line costs far more than the part itself.

Work in progress you can’t find

Half-built orders parked wherever there was room.

Planning on guesses

Production plans built on stock counts nobody fully trusts.

Rack safety

Heavy loads, forklift traffic and damage nobody recorded.

Z.02 / WHAT CHANGES

How we help you win.

  1. Keep lines fedComponents staged by work order, on the shortest path to the line.
  2. Plan on real inventoryMaterial planning runs on live stock, not last month’s count.
  3. Grow without a bigger buildingAI finds the space hiding in the racks you already have.
  4. A safer floorLoad limits, inspections and damage tracked before they become an incident.

ROI CALCULATOR

What would this be worth in your building?

For an example manufacturing plant of 80,000 sq ft, the design targets add up to this every year. Put in your own numbers; it takes about a minute.

Estimated annual savings$143,600 – $341,400About $12,000 to $28,400 a monthRun your own numbers →

Z.04 / HOW WE WORK

One partner, from the first walk-through to go-live.

We map your floor and flows with you, set Spatialis OS up for how your team works, and stay involved until it runs. You deal with one accountable person, not a ticket queue.

FREE GUIDE

PDF · 1 page · 5-minute self-audit

15 signs your warehouse layout is costing you money.

A five-minute self-audit to take onto the floor. Spot where space, travel time and labour are leaking, before peak season does it for you.

FREE GUIDE

Leave your email and the download starts right away.